29 February 2012

Day 10 of the Remodel

Long day for the contractors today.  They were still working when I got home, so Sarah and I took Ellie for dinner and picked up Davey from my parents.  They pretty much finished all the wood flooring.  Only work that remains is to finish the pantry, inside the closet, as well as replacing the base boards.  We also picked our grout colors for the back splash and kitchen tile floor.

Ellie slipped on the new floor.

She wanted to prove she could walk across it.

Davey checking out the new floor

Finished hallway towards door.

Finished hallway towards family room.

"Dining Room" still getting used for storage of tools.

28 February 2012

Day 9 of the Remodel

After Day 9 the remaining tile has been removed from the hardwood floor area.  Some interesting things this uncovered.

  1. There was linoleum under the tile.
  2. There was different linoleum under the wooden rail.
  3. The plywood subfloor in the kitchen/breakfast area is about 1/2 an inch taller than the subfloor in the hallway/dining room... 
Not sure how the contractors are going to handle that last item...

The contractors laid carpet pad everywhere so that we don't step on the unfinished floor and cut our feet or anything else.

as you can sorta see, the rail is no longer here.

you can almost sorta make out that under where the rail was, is a different linoleum.

picture of the doors removed from the pantry and downstairs.

Here is a nice picture of the front door close to being finished.

27 February 2012

Days 5-8 of the Remodel

No work was done Fri-Sun, but the contractors came to our house on Monday again.  They didn't do too much on Monday.  They removed some more base boards and the wooden rail that segregated our Family room from the Kitchen.

We did get the news that demolition on the kitchen cabinets will begin next Monday with installation beginning next Wednesday.  That is when things will get a little crazy due to not having a kitchen for cooking at all.

25 February 2012

Day at the Magic House!

We all went to the Magic House with Grandma today.  It was my first time going, and it was really neat.  Ellie had a blast!
Ellie playing in the water room.

There was a cool restaurant play room as well.

She liked to climb on everything possible.

Ellie in the static room, her pigtails went crazy!



23 February 2012

Day 4 of Remodel

Not much of an update.  Most of the "Dining Room" is now finished.  They left a small gap to help them demo the kitchen tile.

I think the wood looks a lot more red in the pictures.

22 February 2012

Day 3 of Remodel

I'll make this quick since I am sick and feeling really crummy.  Here are some pics of today's progress.

Hallway is pretty much completed.

"Dining room" is about 1/3 complete and should be finished tomorrow.

21 February 2012

Day 2 - More Demo and the Wood Begins!

So after day 2, all the tile has been removed from the dining room and half of the hallway.  We also have some wood floors!  I love looking at it.  My house smells like concrete due to the dust in the air from the concrete board that was under the tile.

Here is some of our new Hardwood floor!

Here is Roxas checking out the construction.

Here is the fully demolished "dining room" and the wood floor covered for its protection.
(Not sure why there are spots on the wall... I think that was my camera)

20 February 2012

Day 1 of the remodel - DEMO

After day 1 about 1/3 of the demo (for the wood floor) is complete.  We are now living in a construction site.  They were nice enough to plastic seal shut some entries to keep dust down.  They also put down some padding so we can walk around easier and put some plastic on the stairs so we don't track dirt upstairs.

"Dining Room" emptied for construction.

"Dining Room" 3/4 of tile removed.

Hallway about 1/3 of demo complete.

Hallway, showing more of the dust "shields"