21 March 2012

Day 29 of the Remodel

Not really much to update on since the last update.  The holes in the drywall have begun to get patched back up, the laundry room has been tiled (waiting on grout, probably today), and we are still waiting on the granite counter tops to come in.

There is still a lot that needs to get done.
  1. Laundry room
    1. grout the tile
    2. put appliances back
  2. Bathroom
    1.  Countertop installed
      1. Install sink/faucets...
    2. Finish off the cabinets
      1. Hardware
      2. Trim
  3. Kitchen
    1. Countertops installed
      1. install sink/faucets/garbage disposal
    2. Upper cabinets installed
      1. Hardware
      2. Under cabinet lighting installed
      3. Crown molding
    3. Finish off the lower cabinets
      1. Hardware
      2. Trim
      3. Decorative Back panel to peninsula
    4. Dishwasher hooked back up
    5. Back Splash
      1. Mudded
      2. Grouted
    6. Pantry
      1. Custom wood shelving
      2. Wine Chiller
  4. Flooring
    1. Thresholds from wood to tile
    2. baseboards re-installed
  5. Painting
    1. Bathroom
    2. Kitchen
    3. Living Room
Whew, I really hope all this can get done in 2.5 weeks.  Its going to be tight.

1 comment:

T said...

2 1/2 weeks.... wow!