There is still a lot that needs to get done.
- Laundry room
- grout the tile
- put appliances back
- Bathroom
- Countertop installed
- Install sink/faucets...
- Finish off the cabinets
- Hardware
- Trim
- Kitchen
- Countertops installed
- install sink/faucets/garbage disposal
- Upper cabinets installed
- Hardware
- Under cabinet lighting installed
- Crown molding
- Finish off the lower cabinets
- Hardware
- Trim
- Decorative Back panel to peninsula
- Dishwasher hooked back up
- Back Splash
- Mudded
- Grouted
- Pantry
- Custom wood shelving
- Wine Chiller
- Flooring
- Thresholds from wood to tile
- baseboards re-installed
- Painting
- Bathroom
- Kitchen
- Living Room